{"id":10177,"identifier":"FK2/0S67CT","persistentUrl":"https://doi.org/10.34820/FK2/0S67CT","protocol":"doi","authority":"10.34820","publisher":"Telkom University Dataverse","publicationDate":"2022-09-29","storageIdentifier":"file://10.34820/FK2/0S67CT","datasetVersion":{"id":677,"datasetId":10177,"datasetPersistentId":"doi:10.34820/FK2/0S67CT","storageIdentifier":"file://10.34820/FK2/0S67CT","versionNumber":1,"versionMinorNumber":0,"versionState":"RELEASED","lastUpdateTime":"2022-09-29T02:19:33Z","releaseTime":"2022-09-29T02:19:33Z","createTime":"2022-09-29T02:19:09Z","license":"CC0","termsOfUse":"CC0 Waiver","fileAccessRequest":false,"metadataBlocks":{"citation":{"displayName":"Citation Metadata","fields":[{"typeName":"title","multiple":false,"typeClass":"primitive","value":"Dataset for parallel flow-shop scheduling"},{"typeName":"author","multiple":true,"typeClass":"compound","value":[{"authorName":{"typeName":"authorName","multiple":false,"typeClass":"primitive","value":"DARU KUSUMA, PURBA"},"authorAffiliation":{"typeName":"authorAffiliation","multiple":false,"typeClass":"primitive","value":"fakultas teknik elektro - rekayasa komputer"}}]},{"typeName":"datasetContact","multiple":true,"typeClass":"compound","value":[{"datasetContactName":{"typeName":"datasetContactName","multiple":false,"typeClass":"primitive","value":"DARU KUSUMA, PURBA"},"datasetContactAffiliation":{"typeName":"datasetContactAffiliation","multiple":false,"typeClass":"primitive","value":"fakultas teknik elektro - rekayasa komputer"},"datasetContactEmail":{"typeName":"datasetContactEmail","multiple":false,"typeClass":"primitive","value":"purbodaru@telkomuniversity.ac.id"}}]},{"typeName":"dsDescription","multiple":true,"typeClass":"compound","value":[{"dsDescriptionValue":{"typeName":"dsDescriptionValue","multiple":false,"typeClass":"primitive","value":"This data consists of 40 jobs. Each job will be processed in four stages. The average processing time of each stage is 5 unit time and follows normal distribution. Each data consists of five attributes: job id, stage 1 processing time, stage 2 processing time, stage 3 processing time, and stage 4 processing time. This data is simulation generated data. There are 30 trials. This data contains 1,200 rows."},"dsDescriptionDate":{"typeName":"dsDescriptionDate","multiple":false,"typeClass":"primitive","value":"2022-09-29"}}]},{"typeName":"subject","multiple":true,"typeClass":"controlledVocabulary","value":["Engineering"]},{"typeName":"keyword","multiple":true,"typeClass":"compound","value":[{"keywordValue":{"typeName":"keywordValue","multiple":false,"typeClass":"primitive","value":"optimization, operations research, flow-shop"}}]},{"typeName":"publication","multiple":true,"typeClass":"compound","value":[{"publicationCitation":{"typeName":"publicationCitation","multiple":false,"typeClass":"primitive","value":"P. D. Kusuma and A. S. Albana, A Parallel Permutation Flow-Shop Scheduling Model by Using a Two-Step Evolutionary Algorithm to Minimize Intermediate Storage with Tolerable Maximum Completion Time, International Journal of Intelligent Engineering and Systems, 14(6), 2021."}}]},{"typeName":"depositor","multiple":false,"typeClass":"primitive","value":"DARU KUSUMA, PURBA"},{"typeName":"dateOfDeposit","multiple":false,"typeClass":"primitive","value":"2022-09-29"}]}},"files":[{"label":"tabelflowshop.sql","restricted":false,"version":1,"datasetVersionId":677,"dataFile":{"id":10178,"persistentId":"doi:10.34820/FK2/0S67CT/YQ3LHI","pidURL":"https://doi.org/10.34820/FK2/0S67CT/YQ3LHI","filename":"tabelflowshop.sql","contentType":"application/x-sql","filesize":22504,"storageIdentifier":"file://183870a0e4b-5bb03876c211","rootDataFileId":-1,"md5":"baf62fdd0da8493c638ff5ec69bdf625","checksum":{"type":"MD5","value":"baf62fdd0da8493c638ff5ec69bdf625"},"creationDate":"2022-09-29"}}],"citation":"DARU KUSUMA, PURBA, 2022, \"Dataset for parallel flow-shop scheduling\", https://doi.org/10.34820/FK2/0S67CT, Telkom University Dataverse, V1"}}