<?xml version='1.0' encoding='UTF-8'?><codeBook xmlns="ddi:codebook:2_5" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="ddi:codebook:2_5 https://ddialliance.org/Specification/DDI-Codebook/2.5/XMLSchema/codebook.xsd" version="2.5"><docDscr><citation><titlStmt><titl>Dataset for parallel flow-shop scheduling</titl><IDNo agency="DOI">doi:10.34820/FK2/0S67CT</IDNo></titlStmt><distStmt><distrbtr source="archive">Telkom University Dataverse</distrbtr><distDate>2022-09-29</distDate></distStmt><verStmt source="archive"><version date="2022-09-29" type="RELEASED">1</version></verStmt><biblCit>DARU KUSUMA, PURBA, 2022, "Dataset for parallel flow-shop scheduling", https://doi.org/10.34820/FK2/0S67CT, Telkom University Dataverse, V1</biblCit></citation></docDscr><stdyDscr><citation><titlStmt><titl>Dataset for parallel flow-shop scheduling</titl><IDNo agency="DOI">doi:10.34820/FK2/0S67CT</IDNo></titlStmt><rspStmt><AuthEnty affiliation="fakultas teknik elektro - rekayasa komputer">DARU KUSUMA, PURBA</AuthEnty></rspStmt><prodStmt/><distStmt><distrbtr source="archive">Telkom University Dataverse</distrbtr><contact affiliation="fakultas teknik elektro - rekayasa komputer" email="purbodaru@telkomuniversity.ac.id">DARU KUSUMA, PURBA</contact><depositr>DARU KUSUMA, PURBA</depositr><depDate>2022-09-29</depDate></distStmt></citation><stdyInfo><subject><keyword>Engineering</keyword><keyword>optimization, operations research, flow-shop</keyword></subject><abstract date="2022-09-29">This data consists of 40 jobs. Each job will be processed in four stages. The average processing time of each stage is 5 unit time and follows normal distribution. Each data consists of five attributes: job id, stage 1 processing time, stage 2 processing time, stage 3 processing time, and stage 4 processing time. This data is simulation generated data. There are 30 trials. This data contains 1,200 rows.</abstract><sumDscr/></stdyInfo><method><dataColl><sources/></dataColl><anlyInfo/></method><dataAccs><notes type="DVN:TOU" level="dv">CC0 Waiver</notes><setAvail/><useStmt/></dataAccs><othrStdyMat><relPubl><citation><biblCit>P. D. Kusuma and A. S. Albana, A Parallel Permutation Flow-Shop Scheduling Model by Using a Two-Step Evolutionary Algorithm to Minimize Intermediate Storage with Tolerable Maximum Completion Time, International Journal of Intelligent Engineering and Systems, 14(6), 2021.</biblCit></citation></relPubl></othrStdyMat></stdyDscr><otherMat ID="f10178" URI="https://doi.org/10.34820/FK2/0S67CT/YQ3LHI" level="datafile"><labl>tabelflowshop.sql</labl><notes level="file" type="DATAVERSE:CONTENTTYPE" subject="Content/MIME Type">application/x-sql</notes></otherMat></codeBook>