31 to 40 of 50 Results
Jul 14, 2022
Purba Daru Kusuma; Abduh Sayid Albana, 2022, "A Parallel Permutation Flow-Shop Scheduling Model by Using a Two-Step Evolutionary Algorithm to Minimize Intermediate Storage with Tolerable Maximum Completion Time", https://doi.org/10.34820/FK2/DC4WZP, Telkom University Dataverse, V1
This work aims to minimize intermediate storage with a tolerable maximum completion time level. In this work, the proposed model was developed by using an evolutionary algorithm (EA). |
Adobe PDF - 426.6 KB - MD5: 09f1d1d15bf9fac5b4d0e9c6d810aad0
|
Jul 14, 2022
Purba Daru Kusuma; Dimas Adiputra, 2022, "Lecturer-course assignment model in national joint courses program to improve education quality and lecturers' time preference", https://doi.org/10.34820/FK2/3UHLDR, Telkom University Dataverse, V1
this work proposes a novel lecturer course assignment model that suits this program. The lecturers' preferred courses and timeslots become hard constraints. The model has three objectives: (1) maximizing the educational quality, (2) maximizing the lecturers' time preference, and... |
Jul 14, 2022 -
Lecturer-course assignment model in national joint courses program to improve education quality and lecturers' time preference
Adobe PDF - 418.3 KB - MD5: 34478424525cfdbcdf7f0ff0d5e81080
|
Jul 14, 2022
Purba Daru Kusuma; Ratna Astuti Nugrahaeni, 2022, "Collaborative flow-shop scheduling using simulated annealing and first price sealed bid auction to minimize total cost and make-span", https://doi.org/10.34820/FK2/GIMMFJ, Telkom University Dataverse, V1
This work proposes a new flow-shop scheduling model that consists of several flow-shops. Every flowshop acts as an independent entity, but there is a collaboration among them. Although the relation between flow-shops and their customers is exclusive, collaboration through produc... |
Jul 14, 2022 -
Collaborative flow-shop scheduling using simulated annealing and first price sealed bid auction to minimize total cost and make-span
Adobe PDF - 410.1 KB - MD5: ebfcd1c95f117258b23f00b5aad5b7d7
|
Jul 14, 2022
Purba Daru Kusuma, 2022, "Multi-objective batch scheduling in collaborative multi-product flow shop system by using non-dominated sorting genetic algorithm", https://doi.org/10.34820/FK2/APKG5I, Telkom University Dataverse, V1
This work aims to develop a novel batch scheduling model for a collaborative multi-product flow shop system. Its objective is to minimize make-span and total production cost. This model is developed by using non-dominated sorting genetic algorithm (NSGA II) which is proven in man... |
Jul 14, 2022 -
Multi-objective batch scheduling in collaborative multi-product flow shop system by using non-dominated sorting genetic algorithm
Adobe PDF - 546.8 KB - MD5: dfea1d8ee7bf9ef7b1081236abd8c15e
|
Jul 14, 2022
Purba Daru Kusuma, 2022, "Collaborative vendor managed inventory model by using multi agent system and continuous review (r, q) replenishment policy", https://doi.org/10.34820/FK2/Z4QOD3, Telkom University Dataverse, V1
In this work, we develop VMI model for the multi-vendor-customer-product scenario. This model is developed based on the collaborative multi-agent system. |
Jul 14, 2022 -
Collaborative vendor managed inventory model by using multi agent system and continuous review (r, q) replenishment policy
Adobe PDF - 1.1 MB - MD5: 89be856f796322ba14979d7cebe083f4
|